Skip to content
Send an e-mailMessage us on WhatsAppLinkedInInstagramFacebookRequest a Quote
+90 332 226 07 76Message us on WhatsApp
Belt Weighers

BK Belt Weigher

The BK belt weigher measures bulk material travelling on a conveyor without the belt having to stop, and reports both the instantaneous flow and the total quantity that has passed. It is retrofitted to an existing conveyor; with the BK-1000, BK-2000 and BK-6000 models it covers flows of up to 1000, 2000 and 6000 tonnes an hour and belt widths up to 2000 mm. It is used in mining, power, chemical, food and building-material plants to track powders, granules and lump material.

Flow
1000 T/H – 6000 T/H
Accurary
0.5 %
Band Speed
3 m/s
Band Width
800mm – 2000mm
Request a quotation

How do you choose between the three models?

The three BK models work on the same principle; they differ in the load they can carry and the conveyor size they fit. On all three, belt speed is at most 3 m/s and conveyor incline at most 18°. The differences can be summed up as follows:

  • BK-1000: belt width up to 800 mm, 10–100 kg load per metre, 500–1000 mm idler spacing, flows up to 1000 t/h
  • BK-2000: belt width up to 1000 mm, 10–200 kg load per metre, 500–1500 mm idler spacing, flows up to 2000 t/h
  • BK-6000: belt width up to 2000 mm, 10–550 kg load per metre, idler spacing up to 2500 mm, flows up to 6000 t/h

The flow figure alone does not decide the model; the real criterion is the load the belt carries per metre. Finding it for your own conveyor is easy: divide the hourly flow in tonnes by the belt speed in m/s and by 3.6. For example, on a belt carrying 1200 tonnes an hour at 2.5 m per second, the load is 1200 ÷ (2.5 × 3.6) ≈ 133 kg/m. That exceeds the BK-1000’s 100 kg/m limit and falls within the BK-2000’s range. The flow limits in the table come from the same calculation: 100 kg/m at 3 m/s is roughly 1080 tonnes an hour.

The lower limit matters too. On all three models the minimum load per metre is 10 kg. If the belt runs for long periods with very little material, for instance a flow below 72 tonnes an hour at 2 m/s, the measurement drops under that limit. This is why we need both the lowest and the highest values of your flow.

Retrofitting to an existing conveyor

The BK does not require building a conveyor from scratch; it can be added to a running line. The system has three parts: load cells carrying the idlers in the weighing zone, a sensor that reads belt speed, and an indicator that combines the two and calculates the result. Before retrofitting, check these four values on your conveyor:

  • Belt width: must be below the upper limit of the chosen model
  • Belt speed: must not exceed 3 m/s; if speed varies via a frequency inverter, the highest value counts
  • Incline: must not exceed 18° in the weighing section
  • Idler spacing: the distance between carrying idlers must fall within the model’s range

You can take these values yourself with a tape measure and by timing a few belt revolutions. Photos of the conveyor and a rough side-view sketch also help to locate the weighing zone.

What does the indicator show?

The BK indicator can show the same measurement in different units: tonnes per hour (t/h), kilograms per hour (kg/h), kilograms per metre (kg/m), total kilograms, belt speed (m/s) and per cent. Tonnes per hour is used to follow production pace on a crushing-screening or loading line; kilograms per hour gives a more readable value on low-rate feed lines. Being able to see load per metre separately provides a practical check: if the value leaves the chosen model’s range, the belt is overloaded or carrying too little. An unexpected drop in the speed reading flags early that the belt is slipping or the drive has a problem.

The indicator is equipped with a 32-bit processor running at 72 MHz or more, a high-resolution Δ-Σ analogue-to-digital converter and a 160 × 32 dot-matrix LCD. Its housing is wall-mounted; being resistant to corrosion, water, dust and impact, it suits use on a dusty quarry site or in a control cabinet next to the conveyor.

Calibration functions and reporting

Set-up and calibration are done digitally from the indicator’s menu. Three functions stand out. Automatic zero tracking follows slow drifts of the zero point while the belt runs empty, limiting the effect of things like fine material stuck to the belt on the total. Speed calibration makes sure the pulses from the sensor are converted to the true belt speed. Belt length calibration lets the indicator recognise one full revolution of the belt; since a belt’s own weight varies along its length, taking empty-belt readings over full revolutions makes the result more stable.

The BK records material arriving from the mine or production line continuously and reports by shift, day, month and year. Production efficiency is thus tracked without a separate weighing step and the time it would take. A worked example: at an average flow of 450 tonnes an hour, a shift that runs 7.5 hours after stoppages produces 3375 tonnes. This figure appears directly in the shift report; at month end the same records can be compared with the dispatch total from the truck scale to follow stock differences.

Key features

Three models, wide flow range

BK-1000, BK-2000 and BK-6000, up to 6000 t/h and 2000 mm belt width.

Six display units

The measurement can be followed in kg/m, t/h, m/s, kg/h, total kg and per cent.

Fits existing conveyors

Load cells, speed sensor and indicator are added to a running conveyor.

Automatic zero tracking and digital calibration

Zero drift is tracked; speed and belt length calibration are done from the menu.

Fast processor, precise converter

A 32-bit processor and a high-resolution Δ-Σ converter calculate changing flows without interruption.

Rugged wall-mounted housing

A housing resistant to corrosion, water, dust and impact suits industrial sites.

Technical Specifications

Model BK-1000 BK-2000 BK-6000
Accurary 0.5 % 0.5 % 0.5 %
Flow (MAX) 1000 T/H 2000 T/H 6000 T/H
Band Speed(MAX) 3 m/s 3 m/s 3 m/s
Capacity 10-100 Kg/m 10-200 Kg/m 10-550 Kg/m
Conveyor Angle MAX) 18° 18° 18°
Band Width (MAX) 800mm 1000mm 2000mm
Distance Between Rolls 500-1000mm 500-1500mm 1500-2500mm

Applications

  • Food and Chemical Production
  • Construction and Mining
  • Chemical
  • Energy
  • Weighing
  • Production

Frequently asked questions

How do the BK-1000, BK-2000 and BK-6000 differ?

They differ in the load per metre they can carry, the belt width they fit and the idler spacing. You can find the load per metre on your belt by dividing the hourly flow by the belt speed and by 3.6, then choose the model that matches.

What if my belt runs faster than 3 m/s?

The BK series figures are given for belt speeds up to 3 m/s. If you plan to measure on a faster belt, send us the speed and flow and we will assess suitability at the quotation stage.

What limit applies on an inclined conveyor?

On all three models the conveyor incline is at most 18°. The weighing section has to be chosen below this limit, at a point where the incline does not change.

Where is the indicator mounted?

The indicator is designed for wall mounting and its housing resists water, dust and impact. A spot is chosen where operators can see it easily and the cable run stays reasonable.

Which periods can reports cover?

Records are reported by shift, day, month and year. Daily production tracking and monthly or yearly tonnage comparisons can therefore be done from the same system.

Why is belt length calibration needed?

A belt’s own weight is not uniform along its length. When the indicator knows the length of one full revolution, it takes empty-belt readings over full revolutions and the zero value becomes more stable.

Request a Quote

Quote requested forBK Belt Weigher

Hourly capacity (optional)

Your details are used only to reply to your request. Privacy Notice

Still with you after installation

Send repair, maintenance and calibration requests through the Technical Service page or by phone.

Technical service request